Val-Cenis
- Sollières-Sardières
Station with 2 charging points (1 of 22 kW DC and 1 of 24 kW AC) with Combo 2 / CHAdeMO / AC T2S connector
Simultaneous AC and DC charging between 1h and 2h.
Period of opening
All year round.
Equipment & services
-
Charging stations for electric vehicles
-
Type 2 socket
-
CCS Combo socket
Prices
0.494 € per kilowatt-hour started.
0.05 € per minute of parking 30 minutes after the end of charging (between 8am and 8pm).
Charging continues as long as the vehicle is plugged in.
Bank authorization: €50.00
Payment by credit card or QR code / mobile app or RFID card.
Languages spoken
- French